Signed in as:
filler@godaddy.com
Signed in as:
filler@godaddy.com
The proposed site is located in the countryside, with the village of Neilston laying approx. 3.48km south-west of the site and the town of Barrhead lays approx. 0.87km south-west.
The site comprises one plot of land which accumulates to approximately 14 acres of land in total, and is located within the administrative area of Glasgow City Council.
The location of the proposed battery storage facility is on Land at Parkhouse Road Barrhead, G78 1TE.
Grid Reference: X 251706, Y 659339
Our proposal is for the development of a 24MW battery storage facility capable of storing and releasing enough energy to power approximately 7,2000 homes and save approximately 10,320 tonnes of carbon annually.
The proposal would comprise a number of containerised units to house battery energy storage systems and associated ancillary infrastructure. Each container will have the appearance of a standard metal ISO/shipping container and soundproofing measures will be implemented.
The containers would be supported by the following ancillary infrastructure: transformers/HV switchgear units, which would be installed on pads, control/storage containers and a communications cabinet, all of which would be finished in dark grey or green to match the containers.
Pre-application community consultation is a statutory requirement for all major applications, and are intended to add value at the start of the development management process. The aim of this consultation is to engage the community and receive feedback which improves upon on the proposal.
This consultation is being carried out in accordance with sections 35A and 35B of The Town and Country Planning (Scotland) Act 1997, as well as sections 4-7 of The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013.
Containers will be approximately 12.16m (length) x 2.43m (width) x 2.6m (height). They will be They will be free standing and arranged in a fashion which makes most effective use of the space available whilst minimising potential impact on landscape and visual amenity. Example specs documents can be found above, exact details will be confirmed at a later date.
An access road would be installed within the site to allow maintenance vehicles to gain access to both the site and the containers, as well as any ancillary structures such as the substation.
Any traffic generated from the development would largely be associated with the construction phase, for which there are limited vehicle movements, restricted to only the delivery and installation of materials. Once operational the proposed development would be controlled remotely and it will only necessary for a maintenance engineer to visit the site on an occasional basis.
The eventual application will be submitted to Glasgow City Council, and will be supported by a number of independent reports which will outline the impact of the development and how these can be mitigated against. This will include a Landscape and Visual Appraisal, an Ecological Appraisal and a Transport Assessment. These reports will be made available on this website upon publication.
Apatura (formally Green Power Consultants) are an expert renewable energy, planning and project management team with over a decade-long record in delivering renewable energy developments.
Apatura provide renewable energy expertise to manage projects from concept through to planning and construction, working with private businesses and individuals from home and across Europe. Our expert renewable energy, planning and project management team oversee the production of a suite of relevant technical documents to support and manage a project through the planning process.
Our consultancy expertise, which spans more than a decade, led to the company's formation as a means to work in partnership with our diverse client base. Our proven track record has delivered an impressive national portfolio of renewable energy developments.
Please reach us at info@aahplanningconsultations.co.uk if you cannot find an answer to your question.
Battery storage is a technology that enables energy to be stored for later use. The storage system charges (or collects energy) from the grid, conventional power plant or renewable energy development and then discharges that energy at a later time.
Increasing needs for system flexibility has enabled battery storage to play an increasing role in the grid power system in recent years and as the provision of wind and solar deployment increases, more policymakers, regulators and utilities are seeking to develop policies to encourage such projects.
Battery storage can enhance power system flexibility and enable high levels of renewable energy integration.
The draft National Policy Statement for Renewable Energy (EN-3) confirms that Agricultural Land Classification (ALC) should not be the predominant test in site selection.
The site is located on two types of land, Grade 3.2 and land which is classified as 'built up'. The Land Capability Classification for Agriculture ranks land on the basis of its potential productivity and cropping flexibility determined by the extent to which its physical characteristics (soil, climate and relief) impose long term restrictions on its agricultural use. A significant section of the site comprises land defined as Grade 3.2 which is considered to be land capable of producing consistently high yields of a narrow range of crops and/ or moderate yields of a wider range. However, the recently adopted National Planning Framework Four supports the development of renewables on prime agricultural land and in this case the site is not in use for the production of agricultural crops or for food production therefore there would be no significant impacts in this respect. The development will also be temporary in nature and reinstated to its previous use once the development ceases.
We consider a range of factors when evaluating land available to deliver a utility-scale clean energy storage scheme, including planning and environmental factors including existing use and quality of land, as well as any designations and constraints. However one of the factors ultimately informing site choice when looking at potential locations for new utility-scale battery storage development is available capacity on the local grid.
In the case of this location, the proximity to the substation allows us to make use of existing electricity infrastructure to connect to the grid. By doing so, this means we can reduce the potential impacts of the proposal.
The proposed battery storage facility will benefit UK consumers as a whole by facilitating the supply of low-cost, low carbon electricity on the national grid.
Throughout the consultation process, we will continue to work with people in the area to ensure that our proposals represent an inclusive scheme, inviting ideas and feedback from local communities and stakeholders.
Crookston Feedback Form (docx)
DownloadMon | 09:00 – 17:00 | |
Tue | 09:00 – 17:00 | |
Wed | 09:00 – 17:00 | |
Thu | 09:00 – 17:00 | |
Fri | 09:00 – 17:00 | |
Sat | Closed | |
Sun | Closed |
AAH Planning Consultations
Copyright © 2024 AAH Planning Consultations - All Rights Reserved.
Powered by GoDaddy